The Pune City Outer Ring Road is a prestigious infrastructure project aimed at decongesting traffic around the industrial hub of Chakan. Rocktech is spearheading the challenging rock excavation phase of this project, which involves handling a massive volume of approximately 1.5 Lakh Cubic Meters of hard rock (Equivalent to excavating 60 Olympic-sized swimming pools of solid rock)
The Technical Challenge: Protecting Green Concrete
High-volume blasting usually carries a risk of high-intensity vibrations. In this project, the primary challenge was to execute massive blasts in close proximity to:
- Freshly Poured Concrete Piers: Blasting near "green" (recently poured) concrete is extremely sensitive, as even minor vibrations can disturb the setting process and structural integrity of the bridge piers.
- Residential Proximity: Managing noise and vibrations for nearby settlements in the Chakan area.
The Rocktech Execution Strategy
1. Integrated Excavation Methodology
We adopted a hybrid approach to maximize efficiency and safety:
- Systematic Drilling: High-precision patterns to ensure uniform fragmentation.
- Controlled Blasting: Used primarily in hard rock strata where mechanical means were insufficient.
- Mechanical Excavation: Deployed in softer patches to minimize the need for blasting near the most sensitive zones.
2. Advanced Blast Engineering
To safeguard the newly constructed highway piers, we implemented:
- Optimized Sequencing: Using millisecond delays to split the total explosive energy, reducing the overall vibration impact (Peak Particle Velocity).
- Vibration Modeling: Predicting the impact on concrete structures before every blast to ensure they remained well within permissible safety limits.
Current Project Status
- Status: Ongoing
- Total Volume: ~1,50,000 Cubic Meters
- Key Milestone: Successful execution of multiple blast cycles without any impact on the structural health of nearby concrete piers or residential units.
Technical Specifications
- Location: Near Chakan, Pune
- Principal Contractor: PNC Infratech Ltd.
- Work Type: Roadway Rock Excavation & Slope Cutting
- Technique: Controlled Blasting & Mechanical Hybrid Excavation
- Safety Protocol: Continuous Vibration Monitoring for Structural Safety